DOCK LEVELLERS

IFP Scotland were appointed by an end user client to carry out maintenance works to dock levellers, IFP Scotland refurbished the steel dock levellers by applying Polycoat Rapide polyaspartic for a rapid turnaround minimising our clients downtime. The dock levellers were fully prepare using our 16" captive blaster with edges being prepared using the Blastrac 1-5HH.



  • Project: Dock Leveller Refurbishment


  • Size: 20 Dock Levellers


  • Products: KDR Polycoat Rapide